Mechanical
Identify the physical point where a component/material and finished output are associated with actual use or assembly. Agree product presentation, identifier access and the boundary between a stores movement and a consumption event.

Define genealogy interfaces for input/output identity, consumption and assembly events, system ownership, corrections, exceptions and trace reconciliation.
Define who establishes input/output identities, when consumption or assembly is captured, and which system owns each relationship and correction. Agree how split/merge quantities, returns, substitutions and rework cross the connected systems and appear in trace results.
Use the integration and exception scenario to assign duplicate, missing, late and offline-event decisions, record reconciliation and restart responsibilities. Retention, access, privacy and regulatory rules remain decisions for the responsible organisation.
Plan product genealogy systems around your identifiers, substrates, production events, system interfaces, exceptions and verification records. Discuss a practical data-flow approach with Oxford Traceability. Your integration review should connect production speed and read-point conditions, line, business-system and network interfaces and the people who run the process.
Discuss your application

Identify the physical point where a component/material and finished output are associated with actual use or assembly. Agree product presentation, identifier access and the boundary between a stores movement and a consumption event.
For Product Genealogy Systems, list the supplies, isolation, protective devices, panels and cable routes required by the proposed installation.
Assign device/line ready and fault states, order/recipe identity and the capture event. Agree the response to unreadable identifiers, missing events, offline operation and controlled restart without silently completing an unresolved history.
Review risk controls, stop behaviour, access, reset and the checks needed around line, business-system and network interfaces.
Define input/output identities, event identifiers, quantities/units and authoritative sources. Preserve split/merge, return, substitution and rework relationships, previous state and correction ownership across system handovers.
Assign actual capture, exception investigation, authorised correction and record reconciliation responsibilities. Agree who confirms both trace directions after a change, and who defines retention, privacy, access and regulatory requirements.
For Product Genealogy Systems, your team can review each stage before the complete installation is put into routine use.
Share real identifiers, substrates, production events and exception records, including the normal range for identifier and data rules for component-to-product genealogy records and the difficult substrate, label or tag behaviour cases.
Compare suitable methods and use focused trials to show how each option performs against production speed and read-point conditions.
Connect the equipment to your line, services and controls while resolving line, business-system and network interfaces for day-to-day operation.
Confirm exception, rework and duplicate handling, then complete and record verification, retention and reconciliation evidence before your operating team takes over.
For your application: check production speed and read-point conditions, line, business-system and network interfaces, exception, rework and duplicate handling, and verification, retention and reconciliation evidence as part of the complete line trial.